Analysis for a 6,000 sq ft concrete skatepark with basic features including quarter pipes, banks, ledges, and rails.
*Amortized over 30-year lifespan*
### Summary (Per Person Based on 1000 Residents)
| Cost Type | Dollars | Hours |
|-----------|---------|--------|
| Amortized Initial Costs | $6.67 | 0.016 |
| Annual Maintenance | $2.50 | 0.024 |
| **Total Annual Cost** | **$9.17** | **0.040** |
### Initial Construction Costs
| Component | Initial Cost ($/hrs) | Annual Cost ($/hrs) | Per Person ($/hrs) | Notes |
|-----------|---------------------|---------------------|-------------------|--------|
| Site Prep | $15,000/120 | $500/4.0 | $0.50/0.004 | Grading, drainage, compaction |
| Concrete Work | $120,000/800 | $4,000/26.7 | $4.00/0.027 | 6" thickness with steel reinforcement |
| Features/Coping | $25,000/160 | $833/5.3 | $0.83/0.005 | Metal edges, rails, transitions |
| Drainage System | $8,000/80 | $267/2.7 | $0.27/0.003 | French drains, catch basins |
| Safety Features | $7,000/40 | $233/1.3 | $0.23/0.001 | Signs, lighting, fencing |
| Design/Engineering | $25,000/0 | $833/0 | $0.83/0 | Professional services |
| **Total** | **$200,000/1,200** | **$6,667/40** | **$6.67/0.016** | |
### Annual Maintenance Costs
| System | Material Cost | Hours | Per Person Cost | Per Person Hours | Notes |
|--------|--------------|-------|-----------------|------------------|--------|
| Concrete Repair | $800 | 32 | $0.80 | 0.008 | Crack filling, surface patching |
| Feature Maintenance | $600 | 24 | $0.60 | 0.006 | Rail repair, edge maintenance |
| Drainage Cleaning | $200 | 16 | $0.20 | 0.004 | Regular cleanout, inspection |
| Safety Inspections | $400 | 20 | $0.40 | 0.005 | Monthly checks, repairs |
| General Cleaning | $500 | 24 | $0.50 | 0.006 | Weekly sweeping, pressure washing |
| **Total** | **$2,500** | **96** | **$2.50** | **0.024** | |
### Design Considerations
- Location selected for good drainage and soil stability
- High-quality concrete mix for durability
- Steel reinforcement throughout
- Proper slope for drainage (1-2%)
- Smooth transitions between features
- Non-slip surface treatment
- Strategic lighting for safety
- Clear sight lines for supervision
- Multiple entry/exit points
### Maintenance Schedule
- Daily: Basic cleanup
- Weekly: Detailed cleaning, safety check
- Monthly: Full inspection, minor repairs
- Annually: Major repairs, feature maintenance
- Every 5-7 years: Surface reconditioning
### Labor Requirements
- Construction requires experienced concrete workers
- Maintenance can be done by general maintenance team
- Monthly skilled inspection needed
- Community volunteers can assist with basic cleaning
### Risk Management
- Regular safety inspections
- Clear usage rules posted
- First aid station nearby
- Good lighting for evening use
- Security cameras recommended
- Emergency contact information displayed